News Articles Directory Video/Pictures Events Reports
         Feedback
 Advertise
 RSS feed
 


News

The assembly of the MC-21-300 fuselage to be tested with the Russian PD-14 engine was completed

The assembly of the MC-21-300 fuselage was completed at the Irkutsk Aviation Plant, a branch of Irkut Corporation (part of UAC). This aircraft will be tested with the Russian PD-14 engine.

The semi-bodies of the prototype were docked at the automated station.  Installation of systems, joining of wing consoles and tail fins of the MC-21-300 aircraft will begin soon.


Recent news:


URL: http://www.ruaviation.com/news/2019/12/10/14450/?h