On Dec 4 the general assembling of Integrated Launch Vehicle “Zenit SLB” was accomplished in Facility of Pad 42: the ascent unit (SC “Elektro-L №2 and upper-stage Fregat-SB) was docked with the LV Zenit-2SB.
The Launch of Elektro-L №2 scheduled on Dec 11 2015 at 04:45 p.m. MT
